Our innovative rubber raised tables have been installed in Cambridge to help calm traffic approaching junctions.
Surface-mounted and installed without excavation, the individual ramp sections of our raised tables offer a more exacting and economical alternative to in-situ formed ascent and descent ramps installed as part of an asphalt system.
The complete table offers integral ramps and tabletop at 3 metres long, ensuring a smooth transit, and provides consistent material consolidation and gradient angles in accordance with DFT recommendations.
Installation In Cambridge
June 16, 2021