Frequently Asked Questions

Find answers to commonly asked questions about Rosehill Highways’ products and services
K
L
How long does it take to install Rosehill products?

All our products are surface-mounted and require no excavation, allowing quick and easy installation with minimal disruption. Products can be exposed to live traffic immediately after installation.

Cycle lane segregation products take between 15-25 minutes per unit to install.

Speed cushions and traffic islands take between 30-45 minutes per unit.

K
L
What is the current lead time?
Smaller orders are dispatched from stock within 3 days of receipt. Larger orders can be manufactured and delivered within 2 weeks. Please contact us for specific lead times.
K
L
What is the product’s lifespan?
Product lifespan can exceed 10+ years if used correctly, and our products have been installed for 15+ years without issue.
K
L
What is the warranty period?
We offer a 3-year warranty on all Rosehill Highways’ products.
K
L
How deep into the surface do the bolts run?
Standard bolts run approx. 100mm into the carriageway, but we offer a range of bolt sizes to suit any scheme.
K
L
Can products be installed at a location with existing street furniture?
Yes – our products can be cut to accommodate posts, signs, and access points, allowing the panels to fit neatly around existing street furniture. We can also produce islands of a non-standard shape with cuts by waterjet.
K
L
Do you offer an installation service?
Yes, we offer a comprehensive installation service across the UK, and can provide traffic management as required.